The Kinsmen Sports Centre is currently undergoing rehabilitation to upgrade the major mechanical and electrical systems.

Project Overview

The Kinsmen Sports Centre has been operating since 1968 and has been identified as a priority for rehabilitation work to fix or replace and upgrade major mechanical and electrical systems, some being over 50 years old. 

Most of the work will be “back of house” including upgrades to the pool basins to meet current safety standards, upgrades to mechanical and electrical systems, and bringing items up to code in the facility. 

Some of the more visible work being completed includes replacement of the fieldhouse flooring, replacing the shower, toilet and faucet fixtures, upgrading some of the lighting to LED, and resurfacing of the main parking lot.

What changes you can expect?

  • Improved pool safety that meets new legislation set out by Alberta Health Services

  • New pipes, toilet and shower fixtures in the changerooms 

  • Updated lighting to LED

  • Updated electrical and mechanical systems

  • Upgrades to the pool basins and new headwalls to meet current safety standards

  • Parking lot renewal

  • Resurfacing of the main floor in the fieldhouse

Project Timeline

Design and construction is occurring at the same time and in phases. This phased approach allows the facility to continue operating some amenities while others are being rehabilitated.

Thank you to members and visitors for your patience while this work disrupts your normal routines. We know recreation centre shutdowns are inconvenient and we are working diligently to complete this rehabilitation project as quickly and safely as possible.

Design

Spring 2021 
Detailed design begins

January 2020

  • Begin preliminary design of the facility rehabilitation and parking lot renewal 

  • Expedite the design required for the Deep Tank and Don Smith Memorial (Competition Pool)

2018-2019

  • Strategy and Concept Phases Complete

  • Studies conducted and scope identified for the project

Construction

build phase

2021 and Beyond
Schedule for remaining phases of construction.

November 2020
Phase 1 construction complete, including reopening Deep Tank, Don Smith Memorial (Competition) Pool, and the aquatic showers.

July 2020
Phase 1 construction begins, Don Smith (Competition) Pool and Deep Tank closed for repairs.

For More Information

Facility Planning and Design